Showing posts with label India. Show all posts
Showing posts with label India. Show all posts

Saturday, June 12, 2010

So much rubbish on LTE/WiMAX in Media

Ever since the 3G/BWA auctions started, the media has been hyper-excited and reporters are making outlandish claims regarding what 3G/BWA technologies can (and can't) do. Yesterday, after the BWA auctions were over, mainstream business and news channels had so-called experts still talking as if BWA and WiMAX are one and the same thing. Then, I happened to see some news articles which I found some amusing stuff.

Sample 1: Economic Times

LTE is a technology patented by Qualcomm, like CDMA for cellular telephony which is what Reliance chose when it started services under Mukesh Ambani. Reliance Communications has since launched parallel services in GSM.

Using this technology the company will needs to deploy fewer base stations, or points from which wireless signal is emitted because a single point covers 50 km on an average. “RIL will save on both tower leasing costs and electronic equipment cost,” said a regional telecom head at an international research firm.

Sample 2: Business Standard

LTE would have faster data speeds as compared to WiMax. Besides, voice services can also be launched through LTE and it would have a wider coverage area.

Sample 3: Business Standard

As BWA spectrum ensures higher speeds, it can support even voice calls. The high bids indicate broadband is not the only objective. “The bidding is being done for the spectrum as a whole, with just a BWA business plan now,” said Mrityunjay Kapoor, country head, Protiviti India. Experts also believe that using BWA spectrum for voice can lead to more efficient use of the spectrum.

This is just a small sample and such nuggets of information are spread all across the news pages. Is this down to lazy journalism or do we have a shortage of real experts on wireless technologies?

Wednesday, October 14, 2009

The Way Ahead for Spectrum Allocations in India?


In early 2008, a committe of experts was set up by the DoT/TRAI to examine the issue of spectrum allocations for 2G services in India, in the face of intense controversy and arguments between different parties, especially regarding the much-criticised 'Subscriber Linked Criterion' for additional spectrum allocation, on top of the start-up spectrum that a UAS/CMTS licensee gets in the beginning, for free. The committee submitted its report sometime back but TRAI made it available only last week. The report makes a series of recommendations regarding allocation and pricing of 2G spectrum in future. If implemented, this will have far-reaching impact on spectrum policy in India. These recommendations are summarised below.

Start-up Spectrum
Existing UAS licensees are entitled to receive 4.4x2 MHz of GSM spectrum or 2.5 x 2 MHz of CDMA spectrum. However, in future, new UAS licensees should not be given any start-up spectrum. In consequence, the license will not be tied to any roll-out obligations. Auctions should be the basis of spectrum allocations in future.

Allocation of additional spectrum
The current practice of allocating additional spectrum based on the so-called Subscriber-Linked Criterion (SLC) should be discontinued in favour of an auction-based approach. The minimum quantum of spectrum for such auctions should be 1x2 MHz, with bidders limited to existing UAS/CMTS licensees only.

Aggregate spectrum holding
The aggregate spectrum holding of a UAS/CMTS licensee should be limited to 25% of the total spectrum assigned for 2G services in the each Licensed Service Area (LSA). Note that this limit applies across all wireless technologies classified as 2G (such as GSM and CDMA).

Spectrum charge (for those holding more than 6.2x2 MHz)
It is also recommended that a licensee, whose current spectrum holding exceeds 6.2 x 2, has to pay for it. In case the additional spectrum (above 6.2 x 2 MHz) was allocated after the cut-off date of 17/01/08, the licensee has to pay an upfront charge, to be decided on pro-rata basis with respect to the price for 3G spectrum. Those who received additional spectrum prior to the cut-off date can either pay an upfront charge as in the previous case or choose to pay annual spectrum fee.

Sharing/trading/merging of spectrum
One of the key recommendations is to allow licensees to share, trade and merge spectrum so as to meet the continuing scarcity of spectrum in the country. Although no limit is set on the amount of spectrum holdings that can be used by a licensee for transfer/merger transactions, however the limit of 25% (mentioned above) will apply to licensees whose total holdings increase after of merger/transfer of spectrum.

Any transfer/merger of spectrum for which the holder(s) did not pay any upfront charge will be subject to a transfer fee. This will apply to start-up or additional spectrum assigned without auction. In case of a merger, the transfer fee is calculated for the lower of the spectrum holdings of the two entities that are merging. The transfer charges recommended will not apply when the spectrum in question was granted with the UAS/CMTS license or as additional spectrum for which upfront charge has subsequently been (or agreed to be) paid or obtained via auction.

In case of sharing, the proposal is to levy a sharing fee, which is determined based on the smaller of blocks being shared by the two parties. In case, the sharing is tri-partite, the sharing fee will be based on the two smaller shared blocks. In both cases, sharing should be allowed only the entire spectrum holding of each party is to be shared with the other parties. Furthermore, such an arrangement is deemed feasible only all 2G spectrum is considered same in terms of spectrum levies.

A discount of 20% on transfer/sharing fee during the year following the issuance of a formal policy notification has been recommended, so as to provide an incentive to the licensees to undertake such transactions.

Lifetime of spectrum allocation
The recommendation is to make service licenses perpetual, renewed every year upon payment of the requisite fee. However, spectrum holding will have separate validity, notified at the time of spectrum assignment/auction. Upon the expiry of this period, the holder should have the first right of refusal for another 20 years. This will incur the payment of a fee determined as per appropriate market-based mechanisms.

Spectrum charges
The charges levied from 2G spectrum holders should be uniform and independent of the spectrum band. This contrasts with the current policy where spectrum charges escalate with the size of holding in a non-proportional basis. Furthermore, the charge for equivalent amount of CDMA and GSM spectrum is also unequal.

Roadmap for future
An important recommendation is for the government to set up a committee to develop a roadmap for exploiting the digital dividend, encompassing a strategic review of spectrum allocation across various bands (both licensed and unlicensed bands), harmonization with ITU allocated bands, policies and plans for government use of spectrum, instruments and institutions for managing towards a more commercial use of spectrum and unleashing the potential of wireless for Indian citizens.

The report is available for download on the TRAI website. Interestingly, a news item appeared in the Economic Times yesterday, quoting unnamed TRAI officials, saying that major changes in spectrum policy are in the offing. Some of the things mentioned therein sound similar to the recommendations of the expert committee.

Tuesday, July 14, 2009

EGoM for 3G

The 3G spectrum auctions are set to be delayed even further with the government announcing the formation of an empowered group of ministers (EGoM), led by the Finance Minister, Pranab Mukherjee. The EGoM also includes the IT & Telecom minister, Mr. A. Raja and a number of senior cabinet ministers. It is expected to take a final decision on the reserve price for 3G and BWA spectrum and also set the number of players to be allowed in each circle.Although Mr Raja had earlier said that auctions will be completed by October 2009, the latest development clearly means that there's no early end in sight. At a time when the operators in Western Europe, North America and the Far-East are getting ready to deploy LTE, India is still struggling to formulate a policy on spectrum auctions.

Wednesday, April 22, 2009

Blazing ahead!

The remarkable growth in Indian mobile subscribers continues unabated. As per figures released by the regulator TRAI, a record 15.64 million new connections were added in March. With the two CDMA biggies (Reliance and Tata) rolling out GSM networks as well, India is all set to breach the 500 million mark before the end of 2009.  For more, see the Lightreading story. The complete report can be downloaded from the TRAI website.

Monday, April 20, 2009

A Guide to India's Telecom Market

Lightreading has come up with another excellent report on the Indian telecom market. It covers a number of aspects including the licensing regime, fixed and wireless services providers, role of infra-sharing, rural coverage.

Tuesday, December 30, 2008

It's Official: 3G Auction Postponed

The DoT has published a revised timetable for the much-awaited auction of 3G spectrum. As per the latest announcement, the key dates are as follows:

Last date for applications: 15/01/09
Publication of ownership details: 16/01/09 (19/01/09)
Bidder ownership compliance certificate: 20/01/09 (21/01/09)
Pre-qualification of bidders: 22/01/09
Mock auction: 27-28/01/09
Start of 3G auction: 30/01/09
Start of BWA auction: 2 days after the end of 3G auction

Note that the dates in brackets are for BWA only.

Thursday, December 18, 2008

More Questions about DoT's 3G/BWA Policy

The DoT memorandum regarding 3G and BWA spectrum is fairly detailed and has a lot of useful information. A careful reading reveals some interesting points. A total of 80 MHz of BWA spectrum is available in 2.3 and 2.5 GHz bands, of which 20 MHz has already been given to the state-owned operators MTNL and BSNL in their (mutually exclusive) respective areas of operation. In the 2.3 GHz band, all the circles have 2 contiguous blocks of 20 MHz each but their location within this band is not the same across all circles. In the 2.5 GHz band, most circles again have 2 contiguous blocks of 20 MHz each but in 3 circles (Maharashtra, Gujarat and AP), paired spectrum is being offered in the form of two 10 MHz blocks with 100 MHz separation between them. What's even more interesting that the same 20 MHz contiguous block (2535-2555 MHz) that is being offered for BWA in most circles is split into two 10 MHz bands (2535-2545 MHz and 2545-2645 MHz) and paired with 10 MHz blocks in the 2645-2655 MHz range in the three circles mentioned above.

This clearly has implications for both impending deployments as well as any
future auctions in the 2.5 GHz band. In particular, BSNL wants to use the paired 2x10 MHz spectrum in FDD mode. It means that another operator who gets BWA spectrum in the 2.5 GHz band in any Gujarat/Maharashtra/AP will either have to use FDD as well or risk a high degree of interference in case it uses the spectrum in TDD mode. Quite expectedly, objections are already being raised.

Another cause for confusion is the policy regarding new 3G operators. DoT is allowing entities that currently do not have a UAS license to bid for 3G spectrum and the license will be awarded to them, in case they are successful in the auction. In the past, UAS licensees have been considered automatically entitled to 4.4 Mhz of GSM spectrum (or 2.5 MHz of CDMA spectrum). It's not clear whether the same rule will be followed in this case. TRAI has asked for more clarity regarding this.


Wednesday, December 17, 2008

3G in the Enterprise

Here comes a reality check regarding the supposed high demand for 3G in the enterprise. According to a survey conducted by the 'Voice and Data' magazine, only 13% of respondents in the enterprise segment see 3G as a broadband wireless solution. Two reasons were mentioned for such a negative response: lack of awareness on what 3G means in terms of services and the fear that it will take a long time for 3G adoption.

Need for More Clarity on 3G and BWA services

The stage is set for spectrum auctions for 3G and BWA services next month. With less than a month to go for the D-day, there is still not enough clarity on what is the DoT definition for '3G' and 'BWA' services. As per the memorandum available on the DoT website,

"3G systems represent the next step in the evolution of mobile cellular communication. 2G systems focus on voice communication, while 3G systems support increased data communication. They allow high speed data transfer of at least 144 kbps, mobile Internet access, entertainment, and triple-play converged communications services, and have markedly greater capacity and spectrum efficiency than 2G systems."

"BWA technologies enable high-speed data communication over wireless links. BWA may offer significant advantages over wireline broadband systems based on cable network or DSL in terms of better coverage, speedy deployment, high scalability, lower maintenance and upgrade costs, and phased investment to match market growth."

It is clear that EVDO, UMTS, HSPA, LTE meet 3G service definition and can operate in 2.1 GHz band. In other words, CDMA operator can bid for 3G spectrum in the 2.1 GHz band and use it to deploy EVDO. At the same time, all of the aforementioned technologies plus WiMAX also fulfil BWA service requirements. Since the proposed BWA spectrum is unpaired, UMTS-FDD, HSPA and EVDO are automatically ruled out but it's still possible to deploye UMTS-TDD in the 2.5 GHz band.

This lack of clarity on what consitutes 3G and BWA can potentially lead to contoversy before and after the auctions.

Monday, December 15, 2008

3G Watch

The long-drawn 3G spectrum game seems to be coming to an end. According to the latest announcement from DoT, 3G auction will start on January 16, 2009. Details of the whole process are provided in a document posted on the DoT website. As per the timetable, the final date for submitting applications is 5th of January. Pre-qualification of bidders will be announced on January 9 and a mock auction will take place on 12th and 13th January. BWA auction will begin two days after the 3G auction is over.

3G spectrum is to be auctioned in the 2.1 GHz band. The amount varies from circle to circle due to limited availability. 4 blocks (2x5 MHz each) will be auctioned in Mumbai and Kolkata whereas Delhi will have only 2 blocks. UP (West) and HP have only 3 blocks available whereas only 2 blocks will be auctioned in Gujarat. A single block is available in West Bengal but there is no 3G spectrum right now in Rajasthan and North-East circles. Rest of the circles have 4 blocks each. Note that these numbers exclude the spectrum already allocated to BSNL and MTNL (1 block each in their respective service areas).

In case of BWA, each service has 3 blocks (20 MHz each) up for auction. MTNL and BSNL have already been allocated BWA spectrum. Of the 4 blocks per circle for BWA, 2 are in 2.3 GHz band and 2 in the 2.5 GHz band. Since unpaired spectrum is being made available for BWA, it is obvious that only TDD-mode deployments will be possible.

Thursday, November 27, 2008

Impact of mobile number portability

We have been hearing for the past few months regarding the introduction of Mobile Number Portability (MNP) in India. DoT has now opened the tender for providing MNP services. Names of the winners will be announced in February 2009. So it's unlikely for the service to be active anytime soon. Nevertheless, MNP will be a big boon to Indian mobile users, as it will free them from the tyranny of mobile operators. At the moment, someone who wishes to change his/her mobile operator has to surrender the existing mobile number and get a new one. This has been a big deterrent to those who want to switch operators. Despite initial opposition, the incumbent operators have now agreed to support MNP. If, as expected, MNP is launched in the second half of 2009, the new 2G operators and prospective 3G operators will benefit the most as they seek to create churn from the incumbents. End users will also finally have real choice. However, it must be noted that they will be expected to pay a fee to get the number ported.

Wednesday, November 26, 2008

3G Watch

According to Mr. A. Raja, India's Minister for Communications and IT, auction of spectrum for 3G services will finish by mid-Jan 2009. He also mentioned that BSNL and MTNL have already been given 3G and WiMAX spectrum and rollout of services is expected within the next couple of months.

In a related development, the CDMA Development Group (CDG) announced that it's holding discussions with the Indian Govt. for releasing spectrum for EVDO services in the 450 MHz band. As per the current plan, CDMA operators are expected to get 3G spectrum in the 800 MHz band only.

Finally, there is speculation that the roll-out norms for new operators might be relaxed.

Friday, September 12, 2008

DoT Amends 3G and BWA Policy

In the wake of the debate triggered between various stakeholders (and Govt depts) after DoT announced the long-awaited 3G and BWA sepctrum policy, a number of changes have been announced.

With regards to 3G, the eligibility criteria has been strengthened by stipulating that a non-UASL entity aiming to bid for spectrum must have prior experience in running 3G services. Spectrum for EVDO will also be allocated via auctions thus reversing the earlier position of giving spectrum to CDMA operators based on subscriber criteria. The reserve price for 2x1.25 MHz in 800 MHz band has been set at 25% of the 3G reserve price (following the pro-rata calculation). Finally, the annual spectrum fee will not be calculated on the incremental revenue earner from 3G services. This is going to be a tricky one, separating revenue earned from 2G and 3G services. The formula for determining the incremental revenue will be specified later.

As for BWA services, CMTS licence holders are now also eligible to bid for spectrum. The spectrum in 2.3 and 2.5 GHz band will be allocated for TDD mode only. The reserve price has now been doubled, such that it becomes 50% of the 3G base price (for a paired 2x5 MHz block). The roll-out conditions have also been changed. Now, 90% of a metro service area must be covered within 5 years and 50% of rural SDCAs must be covered in Category A, B and C areas during the same period.

The full set of amendments are available on the DoT website.

Thursday, August 7, 2008

DoT Guidelines for 3G and BWA Spectrum

The DoT announced its policy for allocation and pricing of 3G and BWA spectrum in August 2008. The 2.3 and 2.5 GHz bands have been earmarked for BWA with 700 MHz and 3.3-3.6 GHz to be considered later subject to availability. For 3G services, the 2.1 GHz band (1920-1980 MHz paired with 2110-2170 MHz) has been identified. In addition, CDMA operators can get spectrum for EVDO services in 450 MHz, 800 MHz and 1900 MHz bands, depending on availability. Any entity that already has a UAS license or fulfils the criteria for getting it is eligible to bid for 3G and BWA spectrum. In case of BWA, Category A and B ISPs will also be allowed to bid.

3G spectrum is to be auctioned per service area in the form of 2x5 MHz blocks, with 5 to 10 such blocks in each service area, depending on availability. Each operator can bid for only one block in a specific service area. CDMA operators can apply for 2x1.25 MHz in 800 MHz and allocations will be made (subject to availability) on the basis of subscriber base in the service area. The price will be equivalent (on a pro-rata basis) to that paid for a 2x5 MHz block by the highest bidder in 2.1 GHz band. The reserve price has been set as follows:
  • Mumbai, Delhi and Category A – Rs 160 Crore
  • Kolkata, Chennai and Category B – Rs 80 Crore
  • Category C – Rs 30 Crore
It has also been stipulated that for future auctions, the reserve price will be same as the highest bid in the upcoming auctions. A controlled, simultaneous, ascending e-auction will be used for 3G spectrum allocation. Note that BSNL and MTNL automatically qualify to get spectrum in the services where they currently operate. Nevertheless, they will have to pay the same price as the highest successful bid.

All licensees will have to pay 1% of AGR as spectrum fees annually from the second year onwards. The spectrum allocation will be for a period of 20 years and non-UASL entities that get spectrum will be granted UASL licenses (upon paying the appropriate UASL entry fees). DoT has mandated that within 5 years of getting the spectrum, 3G operators in metros must cover 90% of the respective service area and 50% of the DHQs/cities in Category A, B and C circles for which they have a license. In the latter case, 15% of the covered DHQs should be rural SDCAs.

In case of BWA, a maximum of 20 MHz can be obtained by a successful bidder across both the bands (in the form of two 5 MHz blocks in each band). The reserve price for auction has been set to one-fourth of the 3G price. The auction process will be same in for 3G spectrum. In case of a tie between two bidders who happen to be UASL operator and Category A/B ISP respectively, preference will be given to the former. If the tie is between two entities with similar license, then subscriber base will be deciding factor. As with 3G spectrum, BSNL and MTNL will automatically get 20 MHz in their respective services areas by paying a price equal to the highest bid during the auction process.

All licensees will have to pay 1% of AGR as spectrum fees annually from the second year onwards. The duration of spectrum ownership will be 15 years. Same considerations apply for new entrants (without UAS/ISP license) as with 3G. BWA service providers in metros will have to cover 90% of their respective service areas within 5 years of getting spectrum. In Category A/B/C circles, 25% rural SDCAs must be covered within 2 years and 50% within 5 years.

Note that DoT has not explicitly ruled out trading and/or sharing of spectrum. As per the guidelines, these, if allowed, will be subject to Government policy. This is in contrast to the guidelines issued earlier in February which clearly stated that “no trading/ reselling of spectrum is allowed”.

Wednesday, July 30, 2008

3G Guidelines Coming Soon ?

There are reports that the Department of Telecommunications (DoT) will set out the 3G policy for India later this week. The Minister for Communications and IT, Mr. A. Raja is expected to make an announcement on Friday, August 1, 2008. Such speculation is not new and many such false dawns have occurred before. However, given that the UPA governmet survived the trust vote recently, it must surely be feeling emboldened to push through some long-pending policy initiatives before the next general election. More on this at GigaOm.

Friday, June 13, 2008

TRAI Consultation on Allocation and Pricing of BWA Spectrum

The recent consultation paper from the Telecom Regulatory Authority of India (TRAI) on “Allocation and Pricing of Spectrum in 2.3-2.4 GHz, 2.5-2.69 GHz and 3.3-3.6 GHz bands” drew more than 30 responses from various stakeholders.

Opinions were sharply divided on the issue of reserve price for 3.3 GHz band. Many respondents (Reliance, Sify, Ortel, WiMAX Forum, Intel, and Telsima) opposed linking the pricing of 3G and BWA spectrum because of differences in range of services and potential returns. However, some (Nokia, Qualcomm, Ericsson, ComFirst and COAI) wanted the same reserve price for all the bands (including 2.1 GHz assigned for 3G) arguing that the same set of services can be provided in all the bands.

For auctioning 3.3 GHz spectrum, the earlier TRAI recommendation was acceptable to most although some (ISPAI, Sify, Spectranet, Ortel and Reliance) opposed auctions because of fears that it will inflate the price. The ISPs favoured allocation based on first-come-first-serve approach with priority to existing licensees while Reliance suggested using the ‘Beauty Parade’ option. BSNL wants to be exempted from paying entry and license fees. Zee Networks and BPL Mobile felt that the reserve price should be increased as the current figure is too low. For the reserve price of the 2.3 GHz and 2.5 GHz bands, three options were suggested:

1. Same as 3.3 GHz band (Reliance, AUSPI, WiMAX Forum)

2. Same as 2.1 GHz band (BPL, COAI, Ericsson, Nokia, Qualcomm)

3. Determined via market-discovery mechanisms (Aircel, Tata Teleservices, Tata Communications, Intel, WiMAX Forum, Zee Network)

A majority of respondents wanted only existing UASL holders and Category A ISPs to be eligible for BWA spectrum in 2.3 GHz and 2.5 GHz bands but some (BPL Mobile, Tata Communications, Ortel Communications) wanted Category B ISPs to be included as well. On the other hand, COAI wanted only UASL operators to be eligible while Tata Teleservices suggested that UASL operators have priority in spectrum allocation. In contrast, Zee Networks proposed that cellular operators should be excluded and MSOs and broadcasters included. The ISPs (and ISPAI) felt that they should be allowed to retain spectrum currently allocated to them in 2.5 GHz and/or 3.3 GHz bands and also get priority in getting additional spectrum in these bands.

The suggested size of spectrum blocks for auction ranged from 5-20 MHz. Similarly, suggestions for minimum and maximum amount of spectrum holding varied quite a bit although there was consensus on the need for allocating spectrum in contiguous blocks. 30-40 MHz was deemed sufficient in the ideal case by most while 15-20 MHz appeared to be acceptable in case only limited amount is to be auctioned initially. Suggestions for upper limit on cumulative spectrum held by a licensee across the three bands (2.3 GHz, 2.5 GHz and 3.3 GHz) ranged from 20 to 45 MHz.

For allocations in the 2.5 GHz band, most respondents favoured the technology neutral approach, allowing both TDD and FDD systems, as per international best practices and related ITU recommendations. However, some (Reliance, AUSPI, Telsima) suggested allocation for TDD only, if limited amount of spectrum is available initially.

Divergent views were expressed on the question of future refarming spectrum in 2.5 GHz band if initial allocations are for TDD only. A few (BSNL, Telsima) felt that it is feasible from both technical and economic perspectives to refarm spectrum at a later date but others wanted to rule it out on various grounds:

· Technical and/or economic infeasibility (BPL Mobile, Reliance, COAI, Ericsson, Nokia)

· Not required as TDD only is not ruled out by the ITU band plans (Tata Communications, WiMAX Forum, Intel)

· Not possible due to license conditions, viz validity period (Tata Teleservices)

· Improve investor confidence by avoiding uncertainty (Cisco, Nokia)

The response of TV broadcasters, satellite services providers and cable operators was limited to the use of 3.3 GHz band for BWA services and they strongly opposed it for fear of disruption to their operations

Thursday, May 29, 2008

Spectrum Saga Goes On

The Indian 3G spectrum saga rumbles on and there still seems to be little sign of auctions happening anytime soon. The latest from the Communications and IT minister, Mr. A Raja, is that guidelines will be issued in June. The DoT already released initial 3G and BWA spectrum allocation guidelines in February. For BWA, it was stated that only existing UASL and ISP Category 'A' licensees will be eligible to bid for spectrum but nothing was said about eligibility for 3G licenses. The CIT minister has repeatedly stated that foreign players will be allowed whereas the Indian regulator, TRAI has been opposed to the idea and wants only incumbent operators to get spectrum.

In the meanwhile, TRAI recently launched a consultation paper on allocation and pricing of spectrum in 2.3-2.4, 2.5-2.6 and 3.4-3.6 GHz bands. Judging from the responses of the different stakeholders, the two hot topics were pricing of BWA spectrum and the co-existence of TDD and FDD systems in the 2.6 GHz band. Most respondents want differential pricing (vis-a-vis 3G and BWA spectrum) to be used, by setting the base price for auction of BWA spectrum much lower than that for 3G spectrum. On the question of TDD-FDD co-existence, a majority of respondents favor the idea and have quoted studies done by the UK regulator Ofcom as well as its guidelines for allocating spectrum in 2.6 GHz band in support. However, there is a significant difference between the Indian and British scenarios as in the case of UK, a total of 190 MHz is on offer whereas in India, it's unlikely that there will be more than 40-50 MHz available in the 2.6 GHz band in the near future.